LNP - Test Plan Development: Reports

Network Interconnection Group

 

LNP Trial Plan Subworking Group - Final Consensus Report appendices

  • Appendix 10 10 Digit Unconditional Trigger Trial Assessment (BPTG)
  • Appendix 11 Test Results Summary & Matrix
  • Appendix 12 Individual Service Provider Conclusions
  • Appendix 13 Industry Residual Issues
  • Appendix 14 BPTG Work Package Summaries
  • Appendix 15 End to End Business Process Results (BPTG)
  • Appendix 16 Stakeholder Survey Summary
  • Appendix 17 Canadian LNP Industry Participants

FILE NAMES:
RE98B10.DOC - 18,944 bytes
RE98B11.DOC - 170,496 bytes
RE98B12.DOC - 46,592 bytes
RE98B13.DOC - 71,680 bytes
RE98B14.DOC - 28,160 bytes
RE98B15.DOC - 33,280 bytes
RE98B16.DOC - 35,840 bytes
RE98B17.DOC - 21,504 bytes

LNP Trial Plan Subworking Group - Final Consensus Reports
1) LNP Field Trial Report (TPRE98B) - October 1998

  • Appendix 1 CISC Structure
  • Appendix 2 Phase 1 Project Schedule
  • Appendix 3 Project Plan
  • Appendix 4 Phase 2 Project Schedule
  • Appendix 5 Business Processes/NPAC SMS Process MAPS
  • Appendix 6 NATG Work Package Summaries
  • Appendix 7 Trial Network Architecture
  • Appendix 8 TPTG Work Package Summaries
  • Appendix 9 10 Digit Unconditional Trigger/Overview

FILE NAMES:
RE98B01.DOC - 26,624 bytes
RE98B03.DOC - 203,264 bytes
RE98B05.DOC - 694,784 bytes
RE98B06.DOC - 91,648 bytes
RE98B07.DOC - 615,424 bytes
RE98B08.DOC - 69,632 bytes
RE98B09.DOC - 107,520 bytes

TPRE98B.DOC - 184,320 bytes - LNP Field Trial Report (TPRE98B) - October 1998

TPRE98D.DOC - 40KB - Industry recommendation for termination of the LNP Trial Plan SWG and associated Task Groups - October 1998

TPRE98C.DOC - 46KB - LNP Trial Plan Subworking Group - Final Consensus Reports - Canadian Industry LNP Entrance Testing Requirements - October 1998

TPRE98A.DOC - 42KB - Executive Summary - (PMTG )Canadian Industry Local Number Portability (LNP) Field Trial(September 1998) - Final Report

TPRE98P2.DOC - 124928 bytes - 1998/06/29 Local Number Portability Field Trial (Phases 2A & 2B) Project Plan- 124928 bytes - 1998/06/29

TPRE98P1.DOC - 19456 bytes - 1998/06/05 LNP INDUSTRY TRIAL COORDINATOR - Phase 1 Status Report

TPRE01.DOC - 49664 bytes - 1997/08/27 CONSENSUS REPORT to the CRTC by INDUSTRY SUB-GROUP - LNP TRIAL TEST PLAN CONSENSUS REPORT - LNP Trial Participants and Location

TPRE01B.DOC - 36864 bytes - 1997/11/12 STATUS REPORT to the CRTC by INDUSTRY SUB-GROUP - LNP TRIAL TEST PLAN STATUS REPORT - LNP Test Plan

TPRE02.DOC - 31744 bytes - 1997/08/28 STATUS REPORT to the CRTC by INDUSTRY SUB-GROUP - LNP TRIAL TEST PLAN STATUS REPORT -LNP Trial Scope and Objectives

TPRE02B.DOC - 55KB - Final Consensus Report - LNP Trial Scope and Objectives (Trial SWG granted final closure on November 12th, 1998)

TPRE03.DOC - 1058304 bytes - LNP Trial, Phase O, Timing and Duration - 1997/08/29

TPRE03B.DOC - 52KB - Final Consensus Report - Timing and Duration (Trial SWG granted final closure on October 29th, 1998)

TPRE04.DOC - 68608 bytes - 1997/08/29 STATUS REPORT to the CRTC by INDUSTRY SUB-GROUP - LNP TRIAL TEST PLAN STATUS REPORT - LNP Trial Business Methods and Procedures

TPRE04B.DOC - 33KB - Final Consensus Report - LNP Business Methods and Procedures - (Trial SWG granted final closure on October 8, 1998)

TPRE05.DOC - 20992 bytes - 1997/08/21 STATUS REPORT to the CRTC by INDUSTRY SUB-GROUP - LNP TRIAL TEST PLAN STATUS REPORT - LNP Test Plan

TPRE05B.DOC - 27KB - Final Consensus Report - LNP Test Plan - (Trial SWG granted final closure on November 12, 1998)

TPRE06.DOC - 229376 bytes - 1997/08/28 STATUS REPORT to the CRTC by INDUSTRY SUB-GROUP - LNP TRIAL TEST PLAN STATUS REPORT -LNP Network Architecture

TPRE06B.DOC - 23KB - Final Consensus Report - Network Architecture (Trial SWG granted final closure on October 8, 1998)

TPRE07.DOC - 27136 bytes - 1997/08/28 CONSENSUS REPORT to the CRTC by INDUSTRY SUB-GROUP - LNP TRIAL TEST PLAN CONSENUS REPORT - Selection of Overall Coordinator and formation of new teams responsible for Detailed Trial Test Plan and Trial Implementation

TPRE08.DOC - 30208 bytes - 1997/08/28 CONSENSUS REPORT to the CRTC by INDUSTRY SUB-GROUP - LNP TRIAL TEST PLAN CONSENUS REPORT - LNP Trial Participants and Location(TELCOPLUS)

COVERTST.DOC - 14336 bytes - Report of the CISC LNP Trial Test Plan Subworking Group - 1997/09/02

 

Project Management Task Group (TM)

No documents

 

Business Process Task Group (TB)

No documents

 

Network Architecture Test Task Group (TA)

No documents

 

Test Plans Task Group (TT)

No documents

Date modified: