Building Access and Inside Wiring: Operational Issues Regarding Access to Inside Wiring by LECs

 

Task(s):

  • BITF003.DOC - 21 KB - Operational issues in connection with access to inside wiring dated 1997/07/09

Contribution(s):

  • BICO017.DOC - 16 KB - Rogers - Operational Issues - 1997/10/10
  • BICO022.DOC - 25 KB - Stentor - Operations Procedures - Installation and Maintenance of Unbundled Local Loops at a Customer Premises - Installation of a CLEC Local Loop to the Inside Wire - 1998/02/16

Report(s):

  • BIRE003.DOC - 31 KB - Task status report on operational issues in connection with access to inside wiring - 1997/09/05
  • BIRE008.DOC - 38 KB - Consensus report: Report on Inside Wire (Dis-)Connection Process - 1999/03/02

Decision(s):

Dispute(s): None

Date modified: