Building Access and Inside Wiring: Operational Issues Regarding Access to Inside Wiring by LECs
Task(s):
- BITF003.DOC - 21 KB - Operational issues in connection with access to inside wiring dated 1997/07/09
Contribution(s):
- BICO017.DOC - 16 KB - Rogers - Operational Issues - 1997/10/10
- BICO022.DOC - 25 KB - Stentor - Operations Procedures - Installation and Maintenance of Unbundled Local Loops at a Customer Premises - Installation of a CLEC Local Loop to the Inside Wire - 1998/02/16
Report(s):
- BIRE003.DOC - 31 KB - Task status report on operational issues in connection with access to inside wiring - 1997/09/05
- BIRE008.DOC - 38 KB - Consensus report: Report on Inside Wire (Dis-)Connection Process - 1999/03/02
Decision(s):
- Letter Decision dated September 8, 1999
Dispute(s): None
- Date modified: