ARCHIVED - Telecom Decision CRTC 2007-108

This page has been archived on the Web

Information identified as archived on the Web is for reference, research or recordkeeping purposes. Archived Decisions, Notices and Orders (DNOs) remain in effect except to the extent they are amended or reversed by the Commission, a court, or the government. The text of archived information has not been altered or updated after the date of archiving. Changes to DNOs are published as “dashes” to the original DNO number. Web pages that are archived on the Web are not subject to the Government of Canada Web Standards. As per the Communications Policy of the Government of Canada, you can request alternate formats by contacting us.

 

Telecom Decision CRTC 2007-108

  Ottawa, 20 November 2007
 

TELUS Communications Company - Application for forbearance from the regulation of high-speed intra-exchange digital network access services

  Reference: 8640-T66-200612714
  In this Decision, the Commission approves TELUS Communications Company's (TCC) request for forbearance from the regulation of high-speed intra-exchange digital network access services in 38 wire centres in Alberta and British Columbia. The Commission denies TCC's request for forbearance in 52 wire centres in Alberta, British Columbia, and Quebec.
 

Introduction

1.

On 10 October 2006, TELUS Communications Company (TCC) filed an application requesting that the Commission make a determination, pursuant to section 34 of the Telecommunications Act (the Act), to refrain wholly and unconditionally from exercising its powers and performing its duties under sections 24, 25, 27, 29, and 31 of the Act with respect to high-speed intra-exchange digital network access (high-speed DNA) services.

2.

In a letter dated 26 October 2006, the Commission suspended TCC's application pending the release of the decision associated with the proceeding initiated by Telecom Public Notice 2005-8.

3.

On 25 May 2007, the Commission issued Telecom Decision 2007-35. In that Decision, the Commission set out, among other things, the criteria that it would use in determining whether it was appropriate to forbear from regulating high-speed DNA services and what the scope of such forbearance would be. On that same date, the Commission issued a letter
 
  • re-opening TCC's application, and
 
  • requesting that TCC and the competitors file certain additional information.1

4.

In Telecom Decision 2007-35, the Commission also considered that there was merit in advising incumbent local exchange carriers (ILECs) of the percentage of competitor network presence2 in wire centres with buildings connected to an ILEC's and/or competitor's high-speed DNA-capable network. The Commission indicated at that time that it would be setting out a process3 shortly to determine whether it was appropriate to disclose publicly the percentage of competitor network presence and, if so, what level of information should be disclosed.

5.

On 14 June 2007, TCC filed a revised application pursuant to the instructions set out in Telecom Decision 2007-35. In this revised application, TCC identified 90 wire centres as being eligible for forbearance: 35 wire centres in Alberta, 42 wire centres in British Columbia, and 13 wire centres in Quebec.

6.

The Commission received submissions and/or data regarding TCC's revised application from Bell Canada; ENMAX Envision Inc.; MTS Allstream Inc.; Quebecor Media Inc., on behalf of its affiliate Videotron Ltd.; Rogers Communications Inc.; and Shaw Communications Inc. The record of this proceeding closed on 10 October 2007 with the filing of TCC's response to a Commission interrogatory. The public record of this proceeding is available on the Commission's website at www.crtc.gc.ca under "Public Proceedings."
 

Commission's analysis and determinations

 

TCC's forbearance requests

7.

In Telecom Decision 2007-35, the Commission considered that forbearance from the regulation of high-speed DNA services was warranted in the following circumstances:
 

a) there were 25 or more buildings connected to an ILEC's and/or competitors' high-speed DNA-capable networks within the wire centre and a competitor network presence of 30 percent or more;

 

b) there were 25 or more buildings connected to an ILEC's and/or competitors' high-speed DNA-capable networks within the wire centre and, although competitor network presence was below 30 percent, the presence of other factors demonstrated that the wire centre was sufficiently competitive to warrant forbearance; and

 

c) there were fewer than 25 buildings connected to an ILEC's and/or competitors' high-speed DNA-capable networks within the wire centre, and competitor network presence, complemented with evidence of rivalrous behaviour, demonstrated that the wire centre was sufficiently competitive to warrant forbearance.

8.

As noted above, TCC sought forbearance in a total of 90 wire centres within the provinces of Alberta, British Columbia, and Quebec. Based on its analysis of the data submitted by all parties to this proceeding, the Commission finds that, in the case of 16 of these wire centres, competitors did not report any buildings connected to their high-speed DNA-capable network. Consistent with Telecom Decision 2007-35,4 the Commission is of the view that it would be inappropriate to grant forbearance in these markets.

9.

Of the remaining 74 wire centres, the Commission notes that 25 wire centres reported less than 25 buildings connected to TCC's and/or competitors' high-speed DNA-capable networks within the wire centre (small markets). The Commission notes that TCC identified the known facilities-based competitors in its operating territories of Alberta, British Columbia, and Quebec, but failed to provide sufficient evidence to demonstrate the existence of rivalrous behaviour at the wire centre as required by Telecom Decision 2007-35.5 Without this requisite information, the Commission is unable to assess at this time the competitive market conditions in the 25 small market wire centres identified in Appendix 1 of this Decision.

10.

The Commission notes that TCC indicated that the remaining 49 wire centres reported 25 or more buildings connected to TCC's and/or competitors' high-speed DNA-capable networks within the wire centre (large markets). Based on its review of the evidence presented by the parties to this proceeding, the Commission finds that competitor network presence is less than 30 percent in 11 of these large markets. Further, the Commission notes that in 3 of these 11 markets, competitor network presence is greater than 20 percent. As noted above, forbearance is warranted in such circumstances only where a combination of other factors exist.6 On the basis of the record of this proceeding, the Commission, at present, is unable to conclude that these 11 markets are sufficiently competitive to warrant forbearance.

11.

With respect to the remaining 38 of these large markets, the Commission finds that the competitor network presence is 30 percent or more.

12.

Pursuant to subsection 34(1) of the Act, the Commission finds as a question of fact that a determination to forbear, to the extent specified in Telecom Decision 2007-35 from the regulation of high-speed DNA services and future services that fall within the definition of high-speed DNA services, in the 38 wire centres listed in Appendix 2, would be consistent with the Canadian telecommunications policy objectives set out in section 7 of the Act.

13.

Pursuant to subsection 34(2) of the Act, the Commission finds as a question of fact that these high-speed DNA services are subject to a level of competition in these 38 wire centres sufficient to protect the interests of users of these services.

14.

Pursuant to subsection 34(3) of the Act, the Commission finds as a question of fact that to forbear, to the extent specified in Telecom Decision 2007-35, from regulating these high-speed DNA services in these 38 wire centres would be unlikely to impair unduly the continuance of a competitive market for these services.

15.

In light of the above, the Commission approves TCC's revised application for forbearance from the regulation of high-speed DNA services and future services that fall within the definition of high-speed DNA services set out in Telecom Decision 2007-35, subject to the powers and duties retained in that Decision, in the 38 wire centres listed in Appendix 2.

16.

The Commission determines that TCC's revised application regarding the remaining 52 wire centres does not meet the forbearance criteria set out in Telecom Decision 2007-35. Accordingly, the Commission denies TCC's revised application for forbearance from the regulation of high-speed DNA services in these 52 wire centres.
 

Disclosure of competitor network presence information

17.

Consistent with the determination set out in its letter dated 13 November 2007, titled Disclosure of information filed in confidence with the Commission pursuant to Telecom Decision 2007-35, the Commission is releasing the following information related to TCC's revised application:
 
  • for three of the large market wire centres in British Columbia, namely Cypress, Lake City, and Hemlock, the competitor network presence is between 20 and 30 percent; and
 
  • for 25 small market wire centres, listed in Appendix 1, competitors reported at least one connected building.
  Secretary General
 

Related Documents

 

Framework for forbearance from regulation of high-speed intra-exchange digital network access services, Telecom Decision CRTC 2007-35, 25 May 2007

 

Framework for forbearance from regulation of high-speed intra-exchange digital services, Telecom Public Notice CRTC 2005-8, 30 June 2005, as amended by Telecom Public Notice CRTC 2005-8-1, 22 July 2005, and Telecom Public Notice CRTC 2005-8-2, 28 October 2005

  This document is available in alternative format upon request, and may also be examined in PDF format or in HTML at the following Internet site: www.crtc.gc.ca
  ___________________

Footnotes:

1 Pursuant to paragraphs 151 and 152 of Telecom Decision 2007‑35, applicant incumbent local exchange carriers and competitors must provide specific information for each wire centre for which an application for forbearance is filed, as per the format set out in the Appendix of Telecom Decision 2007‑35.

2 In this context, competitor network presence is the ratio of buildings connected to the competitors' high‑speed DNA‑capable networks, divided by the total number of buildings connected to all service providers' high‑speed DNA‑capable networks. Multiple competitor connections to a building are counted as one connection, while ILEC and competitor connections to a building are counted as two connections.

3 This process was initiated by a Commission letter dated 4 June 2007. The record of that process closed with the filing of reply comments by several parties on 10 July 2007.

4 Paragraph 173 of Telecom Decision 2007‑35.

5 Paragraph 109 of Telecom Decision 2007‑35.

6 Paragraph 108 of Telecom Decision 2007‑35.

Appendix 1

  Small markets where competitors reported at least one connected building
  Province Exchange Wire Centre
  Alberta Calgary Country Hills
    Calgary McKenzie
  British Columbia Abbotsford Abbotsford
    Chilliwack Chilliwack
    Kelowna Rutland
    Prince George Hartway
    Prince George Pineview
    Saanich Keating
    Saanich Sidney
    Vancouver Alpine
    Vancouver Amherst
    Vancouver Castle
    Vancouver Fairfax
    Victoria Albion
    Victoria Cordova Bay
    Victoria Oak Bay
  Quebec Baie-Comeau Baie-Comeau
    Bonaventure Bonaventure
    Donnacona Donnacona
    Gaspé Gaspé
    Matane Matane
    Montmagny Montmagny
    Saint-Augustin-de-Demaures Saint-Augustin-de-Demaures
    Sainte-Marie-de-Beauce Sainte-Marie-de-Beauce
    Saint-Henri-de-Lévis Saint-Henri-de-Lévis

Appendix 2

  Large markets where competitor network presence is 30 percent or more
  Province Exchange Wire Centre
  Alberta Calgary Airdrie
    Calgary Airways
    Calgary Bonavista
    Calgary Bowness
    Calgary Capitol Hill
    Calgary Crescent Heights
    Calgary Crowchild
    Calgary Elbow Park
    Calgary Forest Lawn
    Calgary Hillhurst
    Calgary Huntington Hills
    Calgary Killarney
    Calgary Kingsland
    Calgary Main Calgary
    Calgary Mount Royal
    Calgary Oakridge
    Calgary Ogden
    Calgary Shawnessy
    Calgary Temple
    Edmonton Bonnie Doon
    Edmonton Jasper Place
    Edmonton Lendrum
    Edmonton Londonderry
    Edmonton Main Edmonton
    Edmonton Norwood
    Edmonton Westmount
    Fort McMurray Fort McMurray
    Grande Prairie Grande Prairie
    Lethbridge Lethbridge
    Medicine Hat Medicine Hat
    Red Deer Red Deer
  British Columbia Nanaimo Nanaimo
    Penticton Penticton
    Vancouver Mutual
    Vancouver Regent
    Vancouver Trinity
    Victoria Belmont
    Victoria Colquitz

Date Modified: 2007-11-20

Date modified: