|
Telecom Decision CRTC 2006-4
|
|
Ottawa, 26 January 2006
|
|
CRTC Interconnection Steering Committee - Consensus items
|
|
Reference: 8621-C12-01/00
|
|
Consensus report submitted to the CISC Steering Committee
|
|
Several CRTC Interconnection Steering Committee (CISC) working groups submitted consensus reports to the CISC Steering Committee (SC).
|
|
On 2 December 2005 the CISC SC approved the following reports:
|
|
- CSCN TIF Report 52 re: TIF 65 Authorized Representatives of numbering Resource Applicants, 19 October 2005 (CNRE052A). The Canadian Steering Committee on Numbering (CSCN) reached consensus on revisions to several Canadian numbering guidelines and adjuncts to include a requirement that only authorized representatives of a company could sign and submit numbering resource requests and associated documentation.
|
|
- CSCN TIF Report 53 re: TIF 66 Modify CSCN Adjunct to CISC Administrative Guidelines, 16 November 2005 (CNRE053A). The CSCN reached consensus on modifications to the CSCN administrative guidelines to reflect current practices.
|
|
- CLEC Access to ILEC's Operational Support Systems Quarterly Update, 4 November 2005 (OSRE003b). The Operational Support Systems Work Group (OSWG) reported that development of competitive local exchange carrier (CLEC) access to the incumbent local exchange carrier's Operational Support Systems (OSS) was proceeding as planned. Bell Canada will provide CLECs access to their OSS by 16 March 2006. TELUS Communications Inc. (TCI) indicated that implementation of CLEC access to TCI's OSS would be delayed because of the strike in its operating territory. TCI will propose a target date for implementation of CLEC access to their OSS for Commission approval in the next quarterly report.
|
|
On 21 December 2005 the SC approved the following report:
|
|
- Installation, Testing and Maintenance Guidelines Version 4.0, 17 November 2005 (BPRE045a and ITMGV40). The Business Process Working Group reached consensus on revisions to the Installation, Testing and Maintenance Guidelines to reflect recent Commission determinations and current industry practices.
|
|
The consensus reports were referred to the Commission for consideration. The reports are available through the Commission's website.
|
|
The Commission has reviewed and approves the above noted consensus reports.
|
|
Secretary General
|
|
This document is available in alternative format upon request, and may also be examined in PDF format or in HTML at the following Internet site: www.crtc.gc.ca
|
Date Modified: 2006-01-26