Agenda for Steering Committee Meeting of 2 March 2011
Type of meeting: walk-around
1. Approval of previous Steering Committee (SC) minutes
Ad hoc meeting of 4 February 2011 (SCMI1101.doc - 63KB).
2. New TIF
The Canadian Steering Committee on Numbering (CSCN) submitted the following TIF for approval:
Review of Canadian NPPA 600 NXX Code Assignment Guideline (CNTF084A.doc - 77KB)
3. Reports
For approval
a) The Business Process Working Group submitted the following consensus report and guidelines:
Installation, Testing and Maintenance for Unbundled loops and Number Portability Guidelines, Version 9.0 (BPRE080a.doc - 90KB and BPGLITMG90.zip - 339KB)
b) The CSCN submitted a consensus report entitled:
CSCN TIF Report 91 re TIF 75 CSCN Guidelines Review – Canadian Central Office Code (NXX) Assignment Guidelines and Appendix F (CNRE091A.doc - 494KB).
c) The Emergency Services Working Group and Network Working Group submitted the following consensus report:
ESRE0054 - 9-1-1 Test Bed Interconnection Report (withdrawn)
4. Next meeting
Face-to-face scheduled for 10 June 2011, 11 a.m. Ottawa time
Teleconference scheduled for 9 September 2011, 11 a.m. Ottawa time.
Walk-around SC meetings will be held as needed.
- Date modified: